Supply, Fabrication and Erection of Nine (9) Units of Chemical Tank
SCOPE OF WORK:
Electromechanical work:
Supply, fabrication, assembling and installation of steel tank: 7-300 cu. m, 1-50 cu. m, 1-250 cu.
- piping connection to tie in point, instrumentation work and cathodic protection.
Supply and install agitator to 1 mixing tank (300 cu. m.) and connect to tie-in point. Supply and
install probe level instrument for the tank
- Client : ENVIRONMENT DEVELOPMENT CO. LTD.
- Location : JUBAIL / K.S.A.
- Project Status : Completed