Electro-Mechanical Division

Location: JUBAIL / K.S.A.
Client: ENVIRONMENT DEVELOPMENT CO. LTD.
PROJECT: COOLING TOWER AND WATER TANK
SCOPE OF WORK:
Electromechanical work: Supply, fabricate and install steel
structure support for the tank. Supply and install heat
exchanger and pipe materials. Supply, fabricate and install
the berglass tank, piping connection to tie in point.
Connect and install eld instrument in the tank and cooling
tower and connect to the network. Conduct hydro-test and
commissioning work.
Water tank capacity is 120 cu. m. each with total 4 units.

imagepic
image

RELATED PROJECTS

Civil Infrastructure Division
Road Construction
Civil and Infrastructure Construction
ELECTRICAL & HVAC UPGRADE FOR EXISTING BUILDINGS IN BERRI GAS PLANT