COOLING TOWER AND WATER TANK

SCOPE OF WORK:
Electromechanical work: Supply, fabricate and install steel
structure support for the tank. Supply and install heat
exchanger and pipe materials. Supply, fabricate and install
the fiberglass tank, piping connection to tie in point.
Connect and install field instrument in the tank and cooling
tower and connect to the network. Conduct hydro-test and
commissioning work.
Water tank capacity is 120 cu. m. each with total 4 units.

  • Client : ENVIRONMENT DEVELOPMENT CO. LTD.
  • Location : JUBAIL / K.S.A.
  • Project Status : Completed