Construction of Plant Facility

Scope of work:
Construction of the factory and facility of about 2,000 sq. m. with complete hvac system, water supply and
waste drainage system, Installation of Sanitary Fixtures, Fire fighting system and Electrical Work.
Mechanical work
Supply, Assembling and Erection of PEB Steel Structure, Installation of process equipment, plumbing and
drainage system, fire fighting system and hvac work.
Electrical Work:
Supply & Installation of Electrical Power System from the SCECO supply going to the inside facility. Supply
and install the following: Panel Boards, Lighting System, Fire Alarm System, Inter-com System, & Sound System.
LV Power Distribution Network, Grounding & Lightning Protection System with all accessories required, Testing
and Commissioning work.

  • Client : Geophysical Equipment Factory
  • Location : AL KHOBAR, K.S.A.
  • Project Status : Completed
https://rafagulf.com/wp-content/uploads/2020/07/97-1-750x500.png

RELATED PROJECTS

Electro-Mechanical Division
Civil Infrastructure Division
Road Construction
Civil and Infrastructure Construction