Civil Works Infrastructure
SITE PREPARATION:
Earth works (cutting, backfilling, leveling and compaction).
- Client : ENVIRONMENTAL DEVELOPMENT COMPANY (EDCO)
- Location : JUBAIL / K.S.A.
- Project Status : Completed
Civil Works Infrastructure
Construction of evaporation ponds & land fills
(excavation, backfilling, installation of hdpe liner, dike wall abd concreting)
Foundations and slabs for (incinerator units, tanks and storage area etc ...)
Civil Works Infrastructure
Supply and installation of steel structure local manufacturing & external manufacturing.
Storage
Incinerator Steel Structure
Oil Separator Shelter
Stabilization Unit Shelter
Construction and installation of chemical tanks
Mixing Tanks
Diesel Tanks
Receving Tanks
VERTIVAL KILN INCINERATOR
Main Part
(a) Burner
The burner has a swirl register for the air to control and adjust the
flame length.
Central lance for light furl oil.
In the middle there is a flame stabilizar.
Flame detectors are on both UV / IR basis.
Ignation pilot burner for liquid gas.
(b) Quencher
A quenching system can be as simple as spraying liquid into the duct just preceding the main scrubbing
vessel, or it can be a separate chamber with its own spray system identical to a spray tower.
Quenchers are designed using the same prinicples as scrubbers
Increasing the gas-liquid contact in them increases their operatinal efficiency.
(c) Scrubber
Scrubbers are air pollution control devices that use liquid to remove particulaer matter or gases from
as inductrial exhaust or flue gas stream.